2012
06 Establish Gaia Energy Co., Ltd
07 Get License of electrical works / Establish GAIA E&&C(Subsidiary company)
Get License of civil engineering works
08~10 Get P/O civil engineering works of 3 MW Wind turbine installation
09~10 Registration of New Renewable Energy company
12~ 75 MW PV plant Engineering for India Project
2013
01~ Off-grid solar power plant engineering for Sumatra,
Indonesia [Enggano Island] Project
02~04 Get P/O 400 kW PV Plant of factory rooftop
05~09 Agreement with KITECH Innovation Research Program
[stand-alone system hybrid solar and wind technologies]
09 Entry and factory registration Chungbuk techno park
(New Renewable Energy and Health Care)
10~ Get P/O 100 kW PV, 2Site Plant of factory rooftop
12~ Get P/O PV plants of Wando (1.3 MW)
2014
01 Head office relocation
02 Get P/O PV plants of Won Buddhism (500 kW)
04 Get P/O PV plants of Suwon city (180 kW)
05~09 KITECH R&D Project (Develop ESS System using EMS)
10 Establish GAIA Energy R&D Center
12 Achieve the track record over 4.5 MW PV power plant installation
2015
01 MOA with KKU of Thailand for Solar Farm and Solar Street Light
04~08 KITECH R&D Project (Develop Solar Street Light using ESS)
05 Achieve the track record over about 5.7 MW PV plant installation
07 Gat Technology Innovation INNO-BIZ License from SMBA Korea
12 Achieve the track record over 10 MW PV power plant installation
2016
03 MOA with SDT of Indonesia for 10 MW Solar Farm of Morowali
03 KITECh R&D Project (Develop Solar Cold Storage System using ESS)
04 GEI R&D Project (Develop Off-Grid Solar Carrier System)
06 Get P/O PV plants of Suwon city (240 kW) and One Buddhism (300 kW)
11 Establish GAIA Energy Lanka Pvt. Ltd(The First Chairman : Seok Heung Kong)
12 Get Government Project of Feasibility study about 5 MW Canal top PV Solar Power in Sri Lanka
12 Achieve the track record over 12.5 MW PV plant installation
2017
10 Get Government Project of Fesibility Study Indonesia Peswaran PV systems (10 MW)
11 Get License of KOREA Safety Certificate (Batch Type Heat Treatment Equipment by FIR Plate Heater with High Radiation)
12 Get the Qualification to Participate in Public Procurement Service(New and Renewable Energy Experiment Station_3 kW Off-Grid PV ESS Pusion System)
12 Participation Company of the New Renwable Energy Supply Project by KOREA Energy Management Corporation, 2018
12 Get Government Project of Fesibility Study ESS auxiliary power system development and demonstration for IoE based data center